Secure 20 Years of EEG Grandfathering: Connect PV Projects to the Grid in Legal Compliance Before December 31

Avoid unnecessary installation work and plan your grid connection using enwitec’s pre-assembled protection and connection technology. Determine early on which components and documentation you’ll need for your project.

Development and Manufacturing in Germany

Pre-assembled connection technology

THE CHALLENGE

Even after the modules are installed, the project is not yet connected to the grid

In addition to installation and commissioning, the wiring, technical documentation, and coordination with the relevant grid operator must all be in sync.

Time Pressure on the Construction Site

Additional wiring and testing tasks can complicate installation planning and tie up valuable work time.

Documentation and Supporting Evidence

Incomplete technical documentation may result in follow-up questions and require additional coordination efforts.

Material Availability

Unclear delivery times and uncertain material availability make it difficult to coordinate the various trades and can delay the planned project schedule.

THE ENWITEC SOLUTION

Pre-assembled connection technology—less effort during implementation

Pre-wired components and clearly defined product variants can simplify installation work. This allows technical requirements and material needs to be incorporated into project planning at an early stage.

Comparison of the Challenge, the enwitec Solution, and the Practical Benefits
Your Challenge The enwitec Solution Your Practical Benefit
Time Constraints & Labor Shortages
Pre-assembled standard wiring in accordance with industry standards
Up to 50% faster on-site installation (average time savings of 4 hours).
Discussions with the utility company
Tested prototypes & complete VDE-AR-N certificates included
Guaranteed VNB approval without time-consuming rework.
Supply Shortages in Q4
Mass Production ramped up in Rogglfing & Wholesale stockpiling
Available shortly at all leading specialty wholesalers.

Development and Manufacturing in Germany

Proven and standards-compliant solutions

Support from a team of experts

TAILORED SOLUTIONS

The Right Connection Technology for Your PV Project

From grid and system protection to AC distribution: Discover the right solutions for the technical implementation of your photovoltaic projects.

01 · Power Grid and Equipment Protection

PowerShield 500 and Pro 1100

Solutions for grid and system protection in PV projects.

02 · Power Source Switching and Backup

Power Switching Boxes and PowerBackup

Solutions for specific switching and backup requirements.

03 · AC Distribution

AC Combination Distribution Panels and Converter Cabinets

Pre-assembled solutions for project-specific connection technology.

PLANNING PROJECTS EFFECTIVELY

Clarify availability and sources of supply in a timely manner

Are you planning a solar project with a tight schedule? Determine early on what connection technology is needed and how procurement can be organized.

01

Determine Product Requirements

Which connection method is right for the project?

02

Coordinate the procurement channel

How can procurement be organized?

03

Check Availability

What are the delivery times for your project?

YOUR ENWILAUS ORDER

Free Guide: “Commissioning 2027 – Passing the VNB Inspection with Flying Colors”

Download our technical checklist to identify potential delays in the grid registration process early on and prepare your customer projects in a structured manner.

Request the guide for free

1. About You and Your Company

2. Your current needs (optional)

Once you have received the required email confirmation, you will receive the guide. For more information, please see our Privacy Policy.

FOR SPECIALIST PARTNERS & INSTALLERS

Get valuable information to help you make informed decisions when selecting and implementing EMS solutions.

FOR PLANNERS & EPC CONTRACTORS

Use the benchmark as a technical and economic basis for decision-making on your projects.

White Paper_EEG2026_Mockup

Frequently Asked Questions

Answers to Questions About Commissioning and Grid Connection

Here you will find answers to frequently asked questions about tenant electricity, shared building supply and the EPIC platform solution.

What is the time limit for the 20-year EEG grandfathering provision?

The official commissioning date prior to December 31, 2026, is crucial for securing the current feed-in tariffs. The key requirements are proof of technical readiness for operation and timely notification of completion to the responsible distribution system operator (DSO).

All enwitec control cabinets and power transfer boxes are delivered fully wired and ready for connection, type-tested, and complete with all necessary schematics. This reduces the on-site wiring and measurement work to simply connecting the supply cables.

Yes. The PowerShield series is fully compliant with the VDE-AR-N 4105 (low voltage) and VDE-AR-N 4110 (medium voltage) application standards. Certificates of conformity are included with every product and are recognized by German distribution network operators (VNBs) as standard.